Skip to content
VARESENEXT
Menu
CHI SIAMO
SERVIZI
SOLUZIONI COWORKING
PRODOTTI
LAVORA
PROGETTI
CONTATTI
Phone
Construction Process
removing old existing windows
after removing old false ceiling
reducing the size of the windows opening, in order to control the natural light, and energy transition
using still bars in new exterior wall. to connect the old structure
using still bars in new exterior wall. to connect the old structure
implementing the steel structure of new internal walls
completing new internal walls with plasterboards
101 new UPVC double sided windows(1.3 k value) arrived from Poland
installing new windows
using second hand tiles as a flat cover on old sills
second floor internal division is ready
installation of false ceiling
covering the old exterior walls, with plasterboard
installing new water network
installing hidden water tank for toilets
toilets piping
toilets pavement installation
toilet internal division with waterproof plasterboard
painting & electrical installation
Shopping Cart
Scroll to Top